1. Construction of a new water supply system in Rzeczyca and Rzeczyca Kolonia - 2.97 km – total cost: PLN 1.2 million.

2. Reconstruction of the water supply system, sanitary water sewage system and storm water drainage system at Nadrzeczna, Krakowska, Klasztorna and Góry streets – total cost: PLN 1.4 million.

3. Paving the trails in 19 gorges (total length of paved roads – 5.56 km) - total cost: PLN 2 million.

4. Reconstruction of Cmentarna Street and refurbishment of the lighting system – total cost: PLN 500 thousand.

5. Construction of a section of a communal road from Góry to Skowieszynek – stage 1: construction of an asphalt road, total length: 2.5 km. Total cost – PLN 2.65 million (subsidy from the European Union – PLN 1.3 million).  

6. Restoration and development of the castle complex in Kazimierz Dolny. Total cost – PLN 7 million (subsidy from the European Union – PLN 4.8 million; subsidy granted by the Minister of Culture and National Heritage – PLN 1 million).

7. Reconstruction and modernization of the marina, construction of a public toilet, installation of a lighting system at the Vistula embankments. Total cost – PLN 5.4 million (subsidy from the European Union – PLN …).

8. Renovation and installation of additional equipment at the Kazimierz Culture Centre. Total cost – PLN 2.6 million (subsidy from the European Union – PLN 1.8 million).

9. Construction of a sports and entertainment arena at the School in Bochotnica. Total cost – PLN 3 million (subsidy from the Lublin Province authorities – approximately PLN 1 million).

11. Modernization of the water supply system, sanitary water sewage system and storm water drainage system at Nadrzeczna, Klasztorna, Krakowska and Góry Streets and modernization of the sewage treatment plant in Kazimierz Dolny. Total cost – PLN 11.5 million (subsidy from the European Union – PLN 8.5 million).

12. Development and adaptation of a public space in Kazimierz Dolny for tourism purposes (new exhibition stands, winter lighting, cast-iron benches, dustbins, cycle racks and flower stands were purchased).

13. Promotional campaign of the Land of Loess Ravines (including TI boards, equipment of the TI Centre in Kazimierz Dolny, publications and advertising materials, website, participation in local and international tourism fairs, GPS information system for tourist objects of interest). Total value of the project: PLN 1 million (subsidy from the European Union – PLN 700 thousand).

14. Realization of the project entitled “Kazimierz Dolny Brand as a Tool of Economic Promotion of the Commune and the Region".